Refurbishment of Walkmill House

Just before Christmas a burst pipe in Walkmill House resulted in the shower room and dining room ceilings requiring replacement.  These repairs are now well underway and Walkmill House will be welcoming guests from 27th March 2010.

Whilst Walkmill House is out of action Gilly and Brian have taken the opportunity to refurbish the shower room which includes a new floor and to repaint the master bedroom, twin bedroom and dining room.

Gilly and Brian are taking ever measure to ensure the repairs are made as sympathetically as possible this includes restoring the ceilings with lath and lime plaster.

Back